FAQ
System requirements
Download
Manual
Glossarial theory
User's registration
The Software TOP
BSC Support
FAQ
Update: 2007/3/27
Q1
When Building Shadow Calculation is installed, the message is displayed.
Q2
Even if the command of Building Shadow Calculation is executed, it doesn't operate.
Q3
If "Second (The angle is shown)" of a red weft is very done to" to change "Worth of second (Time is indicated)" of the approximation difference into "Worth", is it good?
Q4
How should I set it on the calculation day when I do other calculations without making the shade chart?
Q5
The shade line of time on 7 AM is not calculated.
Q6
Can the height of the calculation point be changed?
Q7
Why is the value of the sky factor in the sky chart drawing and the chart of calculation getting product drawing different?
Q8
Can two or more height of the measurement side calculate in shade at a time?
Q9
Can the character filled in on the calculation point such as the shade charts be instructed beforehand (input)?
Q10
After the shade chart etc. are made, can the character filled in on the calculation point be changed?
Q11
The calculation result is not displayed.
Q12
The sunshiny distribution is not displayed.
Q13
When the sunshiny distribution for the section is a mass, it comes in succession, and it is not displayed neatly.
Q14
How is the order when the shade chart is made with two or more calculation points decided?
Q15
The entire balance has worsened when the view standard is changed.
Q16
After the calculation had ended, warning of Autodesk Revit Building was displayed.
Q17
Is there a method of not printing the insertion point?
Q18
Can the color and the thickness of segments of the shade chart and the sunlight curve, etc. be changed?
Q19
Can display/non-display of each calculation result be controlled?